Article Date: 10/24/2014


3D Printing Technology Expected to Become Commercially Available within Three Years


By Steve Rizer

 

Technology that rapidly 3D prints large-scale structures directly from architectural computer-aided-design models is expected to become commercially available in two to three years, a spokesperson for the research entity developing the Contour Crafting system told ConstructionPro Week. Contour Crafting recently netted the $20,000 grand prize in this year’s “Create the Future” design contest.

 

Contour Crafting, created by University of Southern California (USC) Professor Behrokh Khoshnevis, is intended to automate the construction of whole structures and dramatically reduce the time and cost of construction. Potential applications include towers, bridges, low-income housing, and emergency shelters. In addition, the National Aeronautical and Space Administration is considering the technology for building bases on the Moon and Mars.

 

As explained by USC’s Viterbi School of Engineering, “Contour Crafting is a process by which large-scale structures can be fabricated quickly in a layer-by-layer fashion, like 3D-printing a building. The process slashes the cost of building a structure by minimizing the man-hours needed to manufacture it.” For residential structures, the process can “increase the speed at which a house can be put on the market, lowering the financing cost by allowing it to turn a profit for the builder more quickly. The process should also be much safer for construction workers than traditional building techniques, which would lower the cost of insurance for building companies.”

 



NOT YET A SUBSCRIBER?

Purchase a Subscription
with a money-back guarantee
and immediate access

OR

Buy This Item Individually
Price: $20.00


Already a member?

Email:  

Password:  











WPL
PUBLISHING CO, INC.
WPL Publishing - 5750 Bou Avenue #1712 - Rockville, MD 20852

Phone: (301)983-0443  -  Fax: (301)983-4367

All Content and Design Copyright © 2026 WPL Publishing
About Us

Contact Us

Privacy Policy

My Account