Article Date: 06/19/2015


Recovery of Unabsorbed Overhead Required Proof of Standby


Although unabsorbed home office overhead may be recovered even though contract performance never commenced, and formulas other than the Eichleay formula may be used in those situations, a contractor still must prove the basic prerequisites to recovery. When a contractor was never forced to stand by for immediate commencement of the work, the contractor was not allowed to recover unabsorbed overhead using any formula.

 

The Construction Claims Advisor summary of this case is available to ConstructionPro Network members and includes:

  •  The citation for the case (case name, case number, and date filed)
  •  An overview of the case
  •  Background information about the case
  •  A summary of the ruling
  •  A summary of the court’s conclusion and the resulting outcome
  •  Editor's commentary
  •  A link to the complete PDF copy of the original opinion

 



NOT YET A SUBSCRIBER?

Purchase a Subscription
with a money-back guarantee
and immediate access

OR

Buy This Item Individually
Price: $20.00


Already a member?

Email:  

Password:  











WPL
PUBLISHING CO, INC.
WPL Publishing - 5750 Bou Avenue #1712 - Rockville, MD 20852

Phone: (301)983-0443  -  Fax: (301)983-4367

All Content and Design Copyright © 2026 WPL Publishing
About Us

Contact Us

Privacy Policy

My Account