ConstructionPro Week, Volume: Construction Advisor Today - Issue: 42 - 02/11/2010

Lochinvar Develops Library of Drawings of Its Product That Are Configured for Placement in BIMs

Lebanon, Tenn.-based Lochinvar has developed a library of drawings of its commercial and residential products that are fully configured for placement in Autodesk Revit Architecture 2010 building information models. Architects, contractors, and designers using the 2010 edition of Revit software, which allows them to design with parametric modeling and drafting elements, can now download the pre-programmed, 3D Lochinvar equipment models at www.Lochinvar.com. 

 

Lochinvar manufactures water heaters, boilers, pool heaters, and storage tanks. The library currently includes 26 drawings of Lochinvar models, such as the ARMOR Commercial Water Heater, KNIGHT XL Commercial Boiler, SHIELD Commercial Water Heater, SYNC Condensing Boiler, and the floor-standing KNIGHT Residential Heating Boiler. Additional models are in development and will be available for download in the near future, according to the company.

 

"After hearing from many of our customers who use Revit on a regular basis, we developed this library in response to their requests for Lochinvar components designed for use with the software," Lochinvar Executive Vice President Jeff Vallett said. "Now, they can complete their building designs more efficiently and effectively by having quick, easy, and free access to pre-programmed drawings of our high-efficiency equipment."

 

COMMENTS

What's Taking place i am new to this, I stumbled upon this I have discovered It absolutely helpful and it has helped me out loads. I hope to contribute & assist different users like its aided me. Great job.
Posted by: Wolf - Saturday, May 25, 2013 2:47 PM


I'm extremely pleased to uncover this page. I want to

to thank you for ones time just for this fantastic read!!

I definitely really liked every part of it and I have you saved as a favorite

to check out new stuff in your web site.
Posted by: Scantlebury - Tuesday, December 31, 2013 11:46 AM


xbox 360 emulator dragon city hack no survey no password
Posted by: Waechter - Saturday, March 15, 2014 1:07 PM


Highly descriptive article, I loved that

a lot. Will there be a part 2?
Posted by: Valencia - Friday, May 2, 2014 9:45 AM


 









WPL
PUBLISHING CO, INC.
WPL Publishing - 5750 Bou Avenue #1712 - Rockville, MD 20852

Phone: (301)983-0443  -  Fax: (301)983-4367

All Content and Design Copyright © 2026 WPL Publishing
About Us

Contact Us

Privacy Policy

My Account