ConstructionPro Week, Volume: 5 - Issue: 15 - 04/15/2016

Building a Bridge Across the St. Croix River in under Three Minutes

Although the project is a year behind schedule, this time lapse video of the 3,200-foot bridge over the St. Croix River can be watched in 2.24 minutes.  The project includes placement of pre-cast bridge segments and a truss scaffold section for the pier tables that can be lowered intact for disassembly.

 

 

The Minnesota Department of Transportation (MnDOT) has an excellent website with progress photos that explains the design and construction of the various components of the bridge that connects Minnesota and Wisconsin.  Click here to visit the MnDOT site.

 

COMMENTS

 









WPL
PUBLISHING CO, INC.
WPL Publishing - 5750 Bou Avenue #1712 - Rockville, MD 20852

Phone: (301)983-0443  -  Fax: (301)983-4367

All Content and Design Copyright © 2026 WPL Publishing
About Us

Contact Us

Privacy Policy

My Account