ConstructionPro Week, Volume: 5 - Issue: 19 - 05/13/2016

Inside the Seattle Viaduct Tunnel Project by Drone

With Big Bertha back in action, this video captures the progress to-date of the interior finishing operations, with subtext to explain how the roadway walls and deck are constructed.  The drone then proceeds to go in the tunneling machine complex itself, right up to the cutter head.

 

 

The tunnel boring machine – Big Bertha – overheated and cease working back in December 2013. After a two-year hiatus to dig an access shaft, remove the cutter head and appurtenances for repairs, Bertha resumed operations this past December. For a multitude of pictures, videos and technical information, check out the Washington DOT webpage for the project at www.alaskanwayviaduct.org.

 

COMMENTS

 









WPL
PUBLISHING CO, INC.
WPL Publishing - 5750 Bou Avenue #1712 - Rockville, MD 20852

Phone: (301)983-0443  -  Fax: (301)983-4367

All Content and Design Copyright © 2026 WPL Publishing
About Us

Contact Us

Privacy Policy

My Account