ConstructionPro Week, Volume: 5 - Issue: 22 - 06/03/2016

Remote Controlled Dozer with Integrated Machine Control

Another technology innovation that has a safety component is Komatsu's latest large dozer that has both remote control and integrated machine control. Because it can be operated remotely, the operator is removed from harm's way where the dozer needs to operate under risky conditions, according to Peter Robson, Komatsu's director of Intelligent Machine Controls.  The automated control system can autonomously perform heavy dozing and fine grading tasks, making it unnecessary for the operator to be in the cab for many operations.

 

 

Here's a screen shot of the controller, showing the joysticks that can direct the dozer, raise and lower the blade and other functions. See the image below for a view of the remote radio controller.  Perhaps all that time on video games will pay off for budding heavy equipment operators. 

 

Read more about this dozer and other construction equipment here.

 

COMMENTS

 









WPL
PUBLISHING CO, INC.
WPL Publishing - 5750 Bou Avenue #1712 - Rockville, MD 20852

Phone: (301)983-0443  -  Fax: (301)983-4367

All Content and Design Copyright © 2026 WPL Publishing
About Us

Contact Us

Privacy Policy

My Account