Article Date: 04/14/2011


USGBC INTRODUCES LEED FOR HEALTHCARE; OTHER LEED DEVELOPMENTS REPORTED


The U.S. Green Building Council (USGBC) April 8 introduced its latest green building rating system, LEED for Healthcare. The rating system guides the design and construction of both new buildings and major renovations of existing buildings and can be applied to inpatient, outpatient and licensed long-term care facilities, medical offices, assisted ... Log in to view the full text.

 



NOT YET A SUBSCRIBER?

Purchase a Subscription
with a money-back guarantee
and immediate access

Already a member?

Email:

Password:











WPL
PUBLISHING CO, INC.
WPL Publishing - 5750 Bou Avenue #1712 - Rockville, MD 20852

Phone: (301)983-0443  -  Fax: (301)983-4367

All Content and Design Copyright © 2026 WPL Publishing
About Us

Contact Us

Privacy Policy

My Account