Article Date: 10/11/2013


Piecemeal Submittal of Shop Drawings Caused Slow Review


A contractual 30-day review period for shop drawings was premised on the concurrent submittal of coordinated drawings for interrelated systems. The project owner was not bound by the turnaround period when the contractor submitted shop drawings in a piecemeal fashion, even though the owner reviewed those drawings as an accommodation to the contractor.

 

The Construction Claims Advisor summary of this case is available to ConstructionPro Network members and includes:

  • The citation for the case (case name, case number, and date filed)
  • An overview of the case
  • Background information about the case
  • A summary of the ruling
  • A summary of the court’s conclusion and the resulting outcome
  • Editor's commentary
  • A link to the complete PDF copy of the original opinion

 



NOT YET A SUBSCRIBER?

Purchase a Subscription
with a money-back guarantee
and immediate access

OR

Buy This Item Individually
Price: $20.00


Already a member?

Email:

Password:











WPL
PUBLISHING CO, INC.
WPL Publishing - 5750 Bou Avenue #1712 - Rockville, MD 20852

Phone: (301)765-9525  -  Fax: (301)983-4367

All Content and Design Copyright © 2024 WPL Publishing
About Us

Contact Us

Privacy Policy

My Account