ConstructionPro Week, Volume: 6 - Issue: 32 - 08/11/2017

Multi-Directional Elevator Introduced

Thyssenkrupp recently introduced the world’s first rope-less and sideways-moving elevator system, MULTI. Instead of one cabin per shaft moving up and down, the MULTI offers multiple cabins operating in a loop, like a metro system inside a building. The first building to use the MULTI elevators is The East Side Tower in Berlin.

 

 

 

COMMENTS

 









WPL
PUBLISHING CO, INC.
WPL Publishing - 5750 Bou Avenue #1712 - Rockville, MD 20852

Phone: (301)983-0443  -  Fax: (301)983-4367

All Content and Design Copyright © 2026 WPL Publishing
About Us

Contact Us

Privacy Policy

My Account