Article Date: 11/25/2015


Engineer’s On-Site Labor Was Incidental


An engineer, while entitled to a statutory mechanic’s lien, was not exempt from the requirement to give timely written notice even though it did not furnish on-site labor to the commercial project. The engineer’s on-site investigation was incidental to the engineer’s off-site design function and therefore excluded it from an exception to the statute.
 

The Construction Claims Advisor summary of this case is available to ConstructionPro Network members and includes:

  •  The citation for the case (case name, case number, and date filed)
  •  An overview of the case
  •  Background information about the case
  •  A summary of the ruling
  •  A summary of the court’s conclusion and the resulting outcome
  •  Editor's commentary
  •  A link to the complete PDF copy of the original opinion

 



NOT YET A SUBSCRIBER?

Purchase a Subscription
with a money-back guarantee
and immediate access

OR

Buy This Item Individually
Price: $20.00


Already a member?

Email:

Password:











WPL
PUBLISHING CO, INC.
WPL Publishing - 5750 Bou Avenue #1712 - Rockville, MD 20852

Phone: (301)983-0443  -  Fax: (301)983-4367

All Content and Design Copyright © 2026 WPL Publishing
About Us

Contact Us

Privacy Policy

My Account